November 2003 Archives

Prolog Upgrade

| No Comments | No TrackBacks

Upgraded the underlying SWI-Prolog to the most recent stable release, 5.2.10. Checked speeds and generation seems the same, but parsing a tiny bit slower, not enough to worry, change has been made permanent.

Current Status: Infinitive

| No Comments | No TrackBacks

Status update on infinitive work: Prolog code is complete, pending some slight discrepancies for strong and first weak verbs. As the variations are far fewer, t, and tn derived stems will be included.

About this Archive

This page is an archive of entries from November 2003 listed from newest to oldest.

October 2003 is the previous archive.

May 2005 is the next archive.

Find recent content on the main index or look in the archives to find all content.

Pages

Link Roller

Powered by Movable Type 4.34-en